NEWater Infrastructure Plan

NEWater Infrastructure Plan

Project Name:

NEWater Infrastructure Plan

Client:

Public Utilities Board

Date of Completion:

2014

ECAS’ Role:

Accredited Checking

Project Value:

S$140 Million

Description:

ECAS was appointed Accredited Checker for the NEWater Infrastructure Plan Extension Contract C4. The contract includes the design and construction of a 3.3km long, 6 meter in internal diameter segmental tunnel and the laying of steel pipelines and iron pipelines. The method used was either pipe-jacking or open cut. The construction was along Pioneer Road and off Jurong Island Highway.