NEWater Infrastructure Plan Extension

  • Project Name: NEWater Infrastructure Plan Extension
  • Client: Public Utilities Board
  • Date of Completion: 2014
  • ECAS’ Role: Accredited Checking
  • Project Value: S$140 Million

Description:

ECAS was appointed Accredited Checker for the NEWater Infrastructure Plan Extension Contract C4. The contract includes the design and construction of a 3.3km long, 6 meter in internal diameter segmental tunnel and the laying of steel pipelines and iron pipelines. The method used was either pipe-jacking or open cut. The construction was along Gul Road, Pioneer Road and off Jurong Island Highway.