Sumang Walk Vehicular Bridge

  • Project Name: Sumang Walk Vehicular Bridge
  • Client: Housing & Development Board
  • Date of Completion: 2015
  • ECAS’ Role: Accredited Checking

Description:

Provision of Accredited Checking services for the structural design for the vehicular bridge across Punggol Waterway. The proposed bridge consists of dual carriageways with two lanes in each direction. The bridge is straight alignment connecting from the existing Sumang Walk.