Ahmad Ibrahim Secondary School ISH

  • Project Name: Ahmad Ibrahim Secondary School ISH
  • Client: Ministry of Education
  • Date of Completion: 2018
  • ECAS’ Role: Consulting Services
  • Project Value: S$8.2M

Description:

The proposed development is located at existing Ahmad Ibrahim Secondary School. The development consists of the erection of 2-storey indoor sports hall (ISH).

The structural system adopted for the project include Mass Engineered Timber (MET) system for the roof and 2nd storey ISH. The floor comprises cross laminated timber (CLT) panel supported by glued laminated (glulam) beams and PT beam with screw connections. The roof was designed with glulam beam and glulam purlins supported by RC columns.

The upgrading of the Ahmad Ibrahim secondary school was part of a combined contract including Pei Hwa Secondary School.