Bedok Green Secondary School

  • Project Name: Bedok Green Secondary School
  • Client: Ministry of Education
  • Date of Completion: 2020
  • ECAS’ Role: Consulting Services
  • Project Value: S$4.7M

Description:

The proposed development is located at the existing Bedok Green Secondary School. The development consists of the erection of a 2-storey indoor sports hall (ISH).

The structural system adopted for the project include Mass Engineered Timber (MET) system for the roof and second storey ISH. The roof was designed with (glued laminated) glulam beams and glulam purlins supported by RC columns.