Description:
Design and construction of stations and tunnels at Hillview and Cashew. The Downtown Line Stage 2 will have a 16.6km fully underground rail transit system with 12 stations along the Bukit Timah Road corridor and a depot located at Jalan Gali Batu at the northern end of the Downtown Line Stage 2.
Contract 913 comprises of the design, construction and completion of architectural, civil, structural, electrical and mechanical works for the stations at Hillview and Cashew, the connecting bored tunnels between these 2 stations, the bored tunnels at contract boundary of Contract 912 and Contract 913 and the TBM retrieval shaft for Contract 915.
The 3 options under Contract 913 are the design, construction and completion of a vehicular flyover and road widening works along Upper Bukit Timah Road, provision or foundation for future flyover and additional tunnel and surface structure at Hillview Station.