Description:
Proposed New Road and Bus Stops at Sunset Way/ Clementi Road
Soil Condition: Silty Clay of 0.5m in Depth
Excavation Depth: 8m
Retaining System: Open Cut
Challenge: Long & Deep Excavation
Proposed New Road and Bus Stops at Sunset Way/ Clementi Road
Soil Condition: Silty Clay of 0.5m in Depth
Excavation Depth: 8m
Retaining System: Open Cut
Challenge: Long & Deep Excavation