Description:
The project consists of the widening of Jurong East Street 21 and a new road between Boon Lay Way and Jurong Gateway Road including the design and construction of a pedestrian overhead bridge with pre-cast prestressed girders, reinforced concrete pier, pier cap, pilecap and bored micropiles, and a structural steel roof. The access to the POB is by staircases and lifts on both sides of the road. The project also involved numerous reinforced concrete box culverts (RCBC) constructed below the new road extension to form part of the carriageway drainage system. The design of the covered linkways and bus shelters was also included.